Fully Automatic Big Waistband Baby Diaper Machine

Fully Automatic Big Waistband Baby Diaper Machine

Key Specifications / Features

Model No.: BDM-NKHB Hits: 64

Request a quote

Detail Information

Full Elastic Big Waistband Semi-servo Baby Diaper Making Machine

Product Description

1. Design speed:400 pcs/min 
2. Reliable speed:350pcs/minute(According to Middle size ) 
3. Product structure: Leak cuff, ACQ, Up & bottom tissue, Fluff(SAP mixing), Side tape, Frontal tape, Waistband 
4. Product size: XL, L, M, S; 
5. Power source:380V 50HZ 
6. Power consumption: About 180KW 
7. Rejected products rate:≤2%(Excluding defects from glue and splice) 
8. Machine heading: Facing machine, from left to right 
9. Machine weight: About 45 tons 
10. Machine color: According to customer’s request.
11. Machine overall size (L ×W ×H, exclude Stacker, about):21.5m ×6.5m ×3m


Main Parts Brand

 

Items

Brand

Origin & Material

1.PLC

Mitsubishi (Q series)

Japan

2.Touch-screen (10.5 inches)

Mitsubishi(Q series)

Japan

3.Main driving frequency converter

Mitsubishi

 Japan

4. Servo motor

Mitsubishi

Japan

5.Temperature controller

YAMATAKE/Omron

Japan

6.Low-voltage electric appliance

Schneider/Omron

France/Japan

7.Solid relay

Omron

Japan

8.Pnuematic units

Airtac or JYC

Taiwan

9.electric-heat units

Xinyi

Taiwan

10.Key bearings

NTN or NSK or NACHI or KOYO

Japan

11. Timing belts

Jiebao/Hulong

Zhejiang Ningbo

12.Flat belts

Habsit

Switzerland

13.Knife cylinders

china

D2 from U.S.A

14.Rectifiers

china

Components from Germany

15. Main drive motor  

Dongyuan

Taiwan


Diaper Raw Materials
Full Elastic Big Waistband Semi-servo Baby Diaper Making Machine
After-Sale Service

1.Training: 
The buyer can send his technicians to the seller plant for long term training during machine making. All the technicians’ expenses (including return air-tickets, boarding and lodging, and 150-200 dollars as per day salary, etc) are paid by the buyer during installing & debugging at the buyer plant, seller technicians are responsible for short time training for buyer operators.

2. Seven days in advance before every preparation works are ready, the buyer should notify the seller. 
The seller should dispatch 2 – 3 technicians to the buyer plant to install machines. 
3. Guarantee: 12 months after final acceptance at the buyer plant. 
4. Easy worn parts (such as belts, bearings, etc) are not covered against the guarantee. 
5. Damaged parts caused by unforeseen accidents or improper operation are not covered against 
Guarantee 
6: Life-long service

 

 

Comment Form
Nickname*:
E-mail*:
Rate*:
Comments*:

Similar Products